Wadi Gaza Wastewater Treatment Plant & Pumping Station
Palestine
60.000 m3 per day
Scope of Works
- Supply and Installation of MV Panels and Transformers;
- Supply and Installation of all Electrical Equipments
- All Electrical Site Works and Engineering
- 35 pcs. 24kV 21kA MV Switchgears
- 11 pcs. Power Transformers
- Production of 5 pcs. Main Distribution Board, 3 pcs. Compensation, 7 pcs. MCC and 7 pcs. PLC Panels.
- Installation of SCADA and automation system;
- 5000 IOs System
- Computerized maintenance management system (CMMS)
- Power Management with 3 pcs. 1625kVA CHP Gas Generators and 3MW Solar PV Systems
- Tests and Commissioning