TR EN RU

Aspak Ambalaj Rooftop Solar Power Plant

Power of the Projects (kWp) Power of the Projects (kWp) 449 kW
Annual Energy Production (kWh) Annual Energy Production (kWh) 628.600,00 kWh
Household Consumption Provision Household Consumption Provision 210 Household
Number of Panels Used Number of
Panels Used
1.382 Panel
Amount of Carbon Emissions Avoided Amount of Carbon Emissions Avoided 314.457,23 kg/year
Commissioning Date Commissioning
Date
April 2020
Konya

Projects