TR EN RU

Türkoğlu Solar Power Plant

Power of the Projects (kWp) Power of the Projects (kWp) 4 MW
Annual Energy Production (kWh) Annual Energy Production (kWh) 5.600.000,00 kWh
Household Consumption Provision Household Consumption Provision 1.867 Hosehold
Number of Panels Used Number of
Panels Used
33.333 Panel
Amount of Carbon Emissions Avoided Amount of Carbon Emissions Avoided 2.801.400,70 kg/year
Commissioning Date Commissioning
Date
November 2017
Kahramanmaraş

Projects